Addison Library


Architect: Burnidge Cassell Associates
Location: Addison, Illinois
The project consists of new construction which will total approximately 56,000gsf and consists of full first and second floors and a partial third floor. The remainder of the roof at the third level is designed as a green roof with an option for future expansion of the third floor. The building is framed in structural steel and clad in masonry and a curtain wall system. The construction documents for the whole project team, including the architect, structural engineer, and MEP engineer, were done using a 3D Building Information Modeling (BIM) program.

Up Next

                       

    © 2008 C.E. Anderson & Associates P.C.