| Addison Library |
|
|

|
|
| Architect: |
Burnidge Cassell Associates |
|
| Location: |
Addison, Illinois |
|
|
The project consists
of new construction which will total approximately 56,000gsf and consists
of full first and second floors and a partial third floor. The remainder
of the roof at the third level is designed as a green roof with an option
for future expansion of the third floor. The building is framed in
structural steel and clad in masonry and a curtain wall system. The
construction documents for the whole project team, including the
architect, structural engineer, and MEP engineer, were done using a 3D
Building Information Modeling (BIM) program. |
|

|